Daystar Christian Centre

The brief
A major worship and event facility delivered for Daystar Christian Centre, with the brief demanding acoustic control, environmental comfort and reliable operational performance.
The challenge
The event hall had to maintain a controlled acoustic environment despite two 1000kVA generators located less than 10 metres away, while accommodating overflow functions, offices, conveniences and technical spaces.
The response
HSD acted as main contractor, working from consultant drawings for structural, M&E and HVAC inputs. Delivery incorporated cavity walls with Rockwool infill, PU roofing and double glazing to control sound and environmental conditions.
The result
A completed facility delivered for continued worship, events and community use.
The thinking behind the project
Daystar demonstrates the value of construction thinking: architectural intent only becomes useful when materials, specialist systems, sequencing and workmanship are coordinated on site.
Select any view to enlarge it. Use the arrows or keyboard to move through the published image set.
