Container Office

The brief
A church-site office created from two conjoined 40-foot shipping containers.
The challenge
The project had to overcome the practical problems of container conversion — humidity, rust, leakage, temperature, workmanship and service integration — while still producing a credible working environment.
The response
Two containers were joined side-by-side, with shared walls removed, then lined and fitted out with board/fibre finishes, windows, doors and conventional building services. HSD carried design, construction and project-management responsibilities.
The result
A compact completed workplace demonstrating how industrial components can be adapted into a functional building.
The thinking behind the project
Adaptive reuse is only successful when the original component is understood for what it is. Here, the container’s structural shell became the starting point, while insulation, openings, finishes, services and workmanship transformed it into a usable workplace.
Select any view to enlarge it. Use the arrows or keyboard to move through the published image set.
